Customization: | Available |
---|---|
After-sales Service: | Life Time |
Warranty: | 24 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
THA-1000
GB/T 2951.8, GB/T 13021, JTG E50 T1165, IEC 60811-4-1, ISO 6964, ASTM D1603-2012
determination of carbon black content in polyethylene, polypropylene and polybutene plastics.
1. 4-digit digital tube display, 30 temperature program segments can be set.
2. The integrated design of the heating furnace body and the control system facilitates the user's instrument management.
3. The temperature program segment is manually entered and automatically stored. After successful saving, the user only needs one button to start the operation.
4. The two gas instruments of nitrogen and oxygen are manually switched and equipped with high-precision floating-ball gas flow meters.
5. The new type of nano-blanket thermal insulation material achieves excellent thermal insulation and constant temperature effect and high furnace temperature uniformity.
Temperature range | room temperature~1000ºC |
Combustion tube size | Ф30mm*500mm |
Heating element | resistance wire |
Display mode | digital tube display |
Temperature control method | PID programmable control, automatic memory temperature setting section |
Power supply | AC220V/50HZ/60HZ |
Rated power | 1.5KW |
Host size | length 305mm, width 475mm, height 475mm |
Accessories list
1. 1 power cord
2. 1 large tweezers
3. 10 burning boats
4. Medicine spoon 1
5. 1 small tweezers
6. Nitrogen pipe 5 meters
7. Oxygen pipe 5 meters
8. Exhaust pipe 5 meters
9. 1 CD
10. Operation video 1 set
11. 2 quick connectors
11. 2 pressure relief valve connectors
13. 5 fuses
14. 1 pair of high temperature gloves
15. 4 silicone plugs
16. 2 combustion tubes